Square Feet to Cubic Yards Concrete Calculator
This concrete calculator converts square feet to cubic yards. Enter the area of the pour and its thickness, and the tool multiplies them, then divides by 27. The results show cubic yards, cubic feet, and cubic meters, plus bags, weight, and truck loads. Square meters and square yards work as area units too.
By Muhammad AsimPublished Updated How we calculate
Your estimate
Total volume with waste
5.43yd³
- Cubic meters
- 4.15 m³
- Cubic feet
- 146.7 ft³
Premixed bags
- 80 lb bags245
- 60 lb bags326
- 40 lb bags489
- 25 kg bags358
- 20 kg bags445
- Weight
- 21,975 lb · 9,968 kg
- Ready-mix truck loads (10 yd³ each)
- 0.54
- Concrete cost
Formula with your numbers
400 ft² × 0.333 ft × 1.1 = 146.67 ft³
Includes a 10% waste allowance. Bags are rounded up. Weight uses 2,400 kg/m³ (150 lb/ft³).
Your estimate5.43 yd³ · 245 × 80 lb
Planning several pours or a cost sheet? Get the free Excel template (7 tabs, no sign-up).
How to Use the Square Feet to Cubic Yards Calculator
To use the square feet to cubic yards calculator, follow these 4 steps.
- Enter the area in square feet, or switch the unit to square yards or square meters.
- Tap a thickness chip or type the thickness in inches or centimeters.
- Set the number of areas for identical pours.
- Read the cubic yards in the results panel. The 10 percent waste allowance is already included.
Square Feet to Cubic Yards Formula
The square feet to cubic yards formula multiplies area (sq ft) × thickness (ft) and divides by 27. Convert the thickness from inches to feet first.
Cubic yards (yd³) = area (sq ft) × thickness (ft) ÷ 27
Thickness (ft) = thickness (in) ÷ 12
- Area: the surface of the pour in square feet (sq ft).
- Thickness: the depth of the concrete, in inches ÷ 12.
- 27: cubic feet in 1 cubic yard.
The square meters to cubic meters formula multiplies the area in m² by the thickness in meters. A thickness of 10 cm is 0.1 m.
Cubic meters (m³) = area (m²) × thickness (m)
Thickness (m) = thickness (cm) ÷ 100
Worked Example: 400 Square Feet at 4 Inches
An area of 400 sq ft poured 4 inches (10 cm) thick needs 133.3 cubic feet, or 4.94 cubic yards (3.78 m³). The 4 steps below show the math.
- Convert the thickness to feet: 4 in ÷ 12 = 0.333 ft.
- Multiply area by thickness: 400 sq ft × 0.333 ft = 133.3 ft³.
- Divide by 27: 133.3 ÷ 27 = 4.94 yd³.
- Add 10 percent for waste: 4.94 × 1.1 = 5.43 yd³ (4.15 m³).
The metric version works the same way: 40 m² at 10 cm thick is 40 × 0.1 = 4 m³ (5.23 yd³). Move the sliders to change the area and thickness.
Try it
Drag the sliders and the diagram redraws to scale.
Linked to the calculator above: moving a slider updates your estimate.
With your values
400 ft² × 0.333 ft = 133.33 ft³
- Cubic feet
- 133.33
- Cubic yards
- 4.94
- Cubic meters
- 3.78
Where to Use Square Footage
Square footage is the starting point for any flat pour with a known area. These 5 jobs show the result at typical thicknesses:
- Patios: a 250 sq ft patio at 4 in needs 3.09 yd³ (2.36 m³).
- Driveways: a 600 sq ft driveway at 5 in needs 9.26 yd³ (7.08 m³).
- Shed bases: a 120 sq ft shed base at 4 in needs 1.48 yd³ (1.13 m³).
- Overlays: a 300 sq ft overlay at 2 in needs 1.85 yd³ (1.42 m³).
- Irregular areas: the area from a site plan or an irregular shape goes straight into the area field.
Several Areas in One Order
When one truck pours a patio, a walk, and a landing at the same thickness, add the square feet first and convert once. Rounding each area up on its own buys concrete you do not need.
| Area | Square feet | Cubic yards | With 10% waste | Rounded up alone (¼ yd³) |
|---|---|---|---|---|
| Patio, 16 × 12 ft | 192 | 2.37 | 2.61 | 2.75 yd³ |
| Walkway, 30 × 4 ft | 120 | 1.48 | 1.63 | 1.75 yd³ |
| Step landing, 5 × 5 ft | 25 | 0.31 | 0.34 | 0.5 yd³ |
| Total | 337 | 4.16 | 4.58 | 5 yd³ |
Added first, 337 sq ft at 4 in needs 4.58 yd³ with waste, an order of 4.75 yd³. Rounding each area alone adds up to 5 yd³.
Concrete per 100 Square Feet at 6 Thicknesses
A 4 in pour uses 1.23 cubic yards per 100 sq ft (9.29 m²). Read the coverage column to see how many square feet 1 cubic yard fills.
| Thickness | Cubic feet | Cubic yards | Cubic meters | Sq ft per yd³ |
|---|---|---|---|---|
| 2 in (5.1 cm) | 16.7 | 0.62 | 0.47 | 162 |
| 3 in (7.6 cm) | 25.0 | 0.93 | 0.71 | 108 |
| 4 in (10.2 cm) | 33.3 | 1.23 | 0.94 | 81 |
| 5 in (12.7 cm) | 41.7 | 1.54 | 1.18 | 65 |
| 6 in (15.2 cm) | 50.0 | 1.85 | 1.42 | 54 |
| 8 in (20.3 cm) | 66.7 | 2.47 | 1.89 | 40 |
Common Square Footage Mistakes
The 4 most common square footage mistakes involve the thickness unit, the divisor, low spots, and the area itself.
- Enter the thickness in inches, not feet. A thickness of 4 read as feet makes the result 12 times too large.
- Divide by 27, not by 9. Dividing by 9 converts square feet to square yards and ignores the thickness.
- Measure the subgrade depth across the area. Low spots that add 0.5 in (1.3 cm) over 400 sq ft take another 0.62 yd³.
- Measure the area at the inside of the formwork. Outside dimensions add the form boards to the area.
Square Feet to Cubic Yards Concrete Calculator FAQ
How many square feet does a cubic yard of concrete cover?
A cubic yard of concrete covers 81 square feet at 4 inches (10 cm) thick. At 6 inches (15 cm), the same yard covers 54 square feet. The coverage equals 324 divided by the thickness in inches, because 1 cubic yard is 27 cubic feet.
How many cubic yards do I need for 1,000 square feet?
A 1,000 sq ft pour at 4 inches (10 cm) thick needs 12.35 cubic yards (9.44 m³). With the 10 percent waste allowance, order 13.58 yd³. A 1,000 sq ft area is a ready-mix job: the same volume fills 556 bags of 80 lb concrete.
How much concrete is needed per square foot?
One square foot at 4 inches (10 cm) thick needs 0.333 cubic feet (0.0123 yd³) of concrete. Multiply that figure by the total square footage for a quick estimate. For other thicknesses, divide the thickness in inches by 12 to get cubic feet per square foot.
Can I use square meters instead of square feet?
Yes, the area field accepts square meters, square yards, and square feet. Pick m² from the unit menu and enter the thickness in centimeters. The calculator shows cubic meters next to cubic yards, so 40 m² at 10 cm reads 4 m³, or 5.23 yd³.
Should I convert each area separately or add the square feet first?
Add the square feet first, if every area has the same thickness. A 337 sq ft patio, walk, and landing at 4 inches needs 4.75 cubic yards with waste. Rounding each area up on its own comes to 5 yd³. Convert separately only when the thicknesses differ.