Concrete Mix Ratio Calculator
This concrete calculator mix ratio tool splits a volume of concrete into cement, sand, and gravel. The formula multiplies the wet volume by 1.54 for dry volume, then shares the result by the parts of the ratio. Pick 1:2:3 or 1:2:4, enter a volume or dimensions, and read each material in m³ and ft³.
By Muhammad AsimPublished Updated How we calculate
Your estimate
Total volume with waste
1.10m³
- Cubic yards
- 1.44 yd³
- Cubic feet
- 38.8 ft³
Premixed bags
- 80 lb bags65
- 60 lb bags87
- 40 lb bags130
- 25 kg bags95
- 20 kg bags118
- Weight
- 2,640 kg · 5,820 lb
- Ready-mix truck loads (10 yd³ each)
- 0.14
- Concrete cost
Dry materials (1:2:3 general, × 1.54 dry volume)
- Cement
- 0.28 m³
- 10.0 ft³
- Sand
- 0.56 m³
- 19.9 ft³
- Gravel
- 0.85 m³
- 29.9 ft³
Cement: 10 bags of 94 lb (1 ft³ each)
Cement: 9 bags of 50 kg
Cement: 18 bags of 25 kg
Formula with your numbers
35.31 ft³ × 1.1 = 38.85 ft³
Includes a 10% waste allowance. Bags are rounded up. Weight uses 2,400 kg/m³ (150 lb/ft³).
Your estimate1.10 m³ · 65 × 80 lb
Planning several pours or a cost sheet? Get the free Excel template (7 tabs, no sign-up).
How to Use the Mix Ratio Calculator
To use the mix ratio calculator, follow these 4 steps.
- Choose the ratio: 1:2:3 for general work or 1:2:4 for footings.
- Enter the wet concrete volume, or switch to Dimensions and type the slab size.
- Keep or change the waste allowance, which applies before the dry volume step.
- Read cement, sand, and gravel in cubic meters (m³) and cubic feet (ft³), plus cement bags.
Concrete Calculator Mix Ratio Formula
The mix ratio formula multiplies the wet volume by 1.54 to get the dry volume, then gives each material its share of the parts.
Dry volume = wet volume × 1.54
Each material = dry volume × part ÷ sum of parts
- Wet volume: the finished concrete, in cubic meters (m³) or cubic feet (ft³).
- 1.54: the dry volume factor: 1.54 m³ of dry materials makes 1 m³ of wet concrete.
- Part: the number for cement, sand, or gravel in the ratio.
- Sum of parts: 6 for 1:2:3 and 7 for 1:2:4.
The imperial version uses the same steps in cubic feet. Convert cubic yards to cubic feet first by multiplying by 27, then apply the dry volume factor and the ratio.
Dry volume (ft³) = wet volume (yd³) × 27 × 1.54
1 m³ = 35.3 ft³
Worked Example: 1 m³ of Concrete at 1:2:3
One cubic meter (1.31 yd³) of concrete at 1:2:3 needs 0.26 m³ of cement, 0.51 m³ of sand, and 0.77 m³ of gravel. The example excludes waste. The 4 steps below show the math.
- Find the dry volume: 1 m³ × 1.54 = 1.54 m³.
- Add the parts: 1 + 2 + 3 = 6.
- Split the dry volume: cement 1.54 × 1 ÷ 6 = 0.26 m³, sand 1.54 × 2 ÷ 6 = 0.51 m³.
- Finish with gravel: 1.54 × 3 ÷ 6 = 0.77 m³ (27.2 ft³).
At 1:2:4 the same cubic meter needs 0.22 m³ of cement, 0.44 m³ of sand, and 0.88 m³ of gravel.
Mix ratio splitter
- Cement0.26 m³
- Sand0.51 m³
- Gravel or crushed stone0.77 m³
Where to Use Each Mix Ratio
Use 1:2:3 for general concrete and 1:2:4 for footings. These 4 jobs show where each ratio fits:
- Patios and paths: a 12 × 10 ft slab at 4 in, 1:2:3, needs 0.29 m³ of cement, 0.58 m³ of sand, and 0.87 m³ of gravel.
- Garden slabs and pads: 1:2:3 suits general work that carries no structural load.
- Footings: 1:2:4 is the footing ratio; footing size depends on local code, soil, and an engineer.
- Post holes and small fills: 1:2:3 suits hand-mixed batches for general use.
Cement, Sand, and Gravel per Cubic Meter and Cubic Yard
One cubic yard of 1:2:3 concrete needs 6.9 ft³ of cement, with sand and gravel in the table below.
| Ratio | Material | Per 1 m³ (m³) | Per 1 yd³ (ft³) |
|---|---|---|---|
| 1:2:3 | Cement | 0.26 | 6.9 |
| 1:2:3 | Sand | 0.51 | 13.9 |
| 1:2:3 | Gravel | 0.77 | 20.8 |
| 1:2:4 | Cement | 0.22 | 5.9 |
| 1:2:4 | Sand | 0.44 | 11.9 |
| 1:2:4 | Gravel | 0.88 | 23.8 |
Batching by the Bucket: One Bag of Cement at a Time
On site, the ratio is easiest to keep with one bag of cement per batch and a 5-gallon bucket as the measure. A 94 lb bag of portland cement holds 1 ft³, and a 5-gallon bucket holds 0.668 ft³, so at 1:2:3 one bag goes with 3.0 buckets of sand and 4.5 buckets of gravel. That batch makes about 3.90 ft³ of concrete.
| Ratio and batch | Cement | Sand | Gravel | Concrete made |
|---|---|---|---|---|
| 1:2:3, 1 bag (94 lb) | 1.5 buckets | 3.0 buckets | 4.5 buckets | 3.90 ft³ |
| 1:2:3, ½ bag (47 lb) | 0.7 buckets | 1.5 buckets | 2.2 buckets | 1.95 ft³ |
| 1:2:4, 1 bag (94 lb) | 1.5 buckets | 3.0 buckets | 6.0 buckets | 4.55 ft³ |
| 1:2:4, ½ bag (47 lb) | 0.7 buckets | 1.5 buckets | 3.0 buckets | 2.27 ft³ |
A 4 × 4 ft pad at 4 in with 10% waste needs 5.87 ft³ of concrete, so at 1:2:3 it takes 1.5 batches, or 2 bags of cement bought whole.
Common Mix Ratio Mistakes
The 4 most common mix ratio mistakes are listed below.
- Apply the 1.54 dry volume factor. Splitting the wet volume by the ratio leaves the batch 35 percent short.
- Measure every part with the same container, such as one bucket for cement, sand, and gravel.
- Match the ratio to the job: 1:2:3 for general work and 1:2:4 for footings.
- Add waste before you buy materials. The worked example excludes waste, but the calculator adds 10 percent by default.
Concrete Mix Ratio Calculator FAQ
What does a 1:2:3 concrete mix ratio mean?
A 1:2:3 concrete mix ratio means 1 part cement, 2 parts sand, and 3 parts gravel by volume. The parts add to 6, so cement takes one sixth of the dry volume. For 1 m³ of concrete, that share is 0.26 m³ of cement after the 1.54 dry volume factor.
Why does the calculator multiply by 1.54?
The calculator multiplies by 1.54 because 1.54 m³ of dry materials makes 1 m³ of wet concrete. Loose cement, sand, and gravel take up more room before mixing than the finished concrete does. Skipping the factor leaves every material 35 percent short of the batch you need.
Which mix ratio should I use for footings?
Use 1:2:4 for footings, which is 1 part cement, 2 parts sand, and 4 parts gravel. Footing width, depth, and strength depend on local code and soil, so ask a structural engineer or your building department before you pour. Use the footing calculator to find the volume.
How much cement is in 1 cubic yard of 1:2:3 concrete?
One cubic yard of 1:2:3 concrete needs 6.9 cubic feet of cement, or 7 bags of 94 lb, before waste. The dry volume is 27 ft³ × 1.54, and cement takes 1 of the 6 parts. A 94 lb bag holds 1 ft³ (CMHA TEK 04-02A).
Does the worked example include waste?
No, the worked example excludes waste and shows the exact split for 1 m³. The calculator above adds a 10 percent waste allowance by default, so its numbers run 10 percent higher than the example. Set the waste field to 0 to match the example exactly.
How many buckets of sand and gravel go with one bag of cement?
At 1:2:3, one 94 lb bag of cement goes with about 3 level 5-gallon buckets of sand and 4.5 buckets of gravel. The bag holds about 1.5 buckets of cement. Together they make roughly 3.9 cubic feet of concrete once water is added.
Sources
Every result on this page uses plain geometry and the exact unit definitions below. The full list of formulas and constants is on the How we calculate page.





