This concrete calculator for a monolithic slab adds the flat slab and the deeper thickened edge around its perimeter, poured together in one placement. Enter the length, width, slab thickness, edge width, and total edge depth. The results show cubic yards, cubic feet, and cubic meters, bag counts, weight, and cost.
By Muhammad AsimPublished Updated How we calculate
Your estimate
Total volume with waste
10.32yd³
- Cubic meters
- 7.89 m³
- Cubic feet
- 278.7 ft³
Premixed bags
- 80 lb bags465
- 60 lb bags620
- 40 lb bags929
- 25 kg bags679
- 20 kg bags845
- Weight
- 41,752 lb · 18,938 kg
- Ready-mix truck loads (10 yd³ each)
- 1.03
- Concrete cost
Formula with your numbers
24 ft × 24 ft × 0.333 ft + (2 × (24 ft + 24 ft) − 4 × 1 ft) × 1 ft × (1 ft − 0.333 ft) × 1.1 = 278.67 ft³
Includes a 10% waste allowance. Bags are rounded up. Weight uses 2,400 kg/m³ (150 lb/ft³).
Your estimate10.32 yd³ · 465 × 80 lb
Planning several pours or a cost sheet? Get the free Excel template (7 tabs, no sign-up).
How to Use the Concrete Calculator for a Monolithic Slab
The monolithic slab calculator works in 4 steps.
- Enter the outside length and width of the slab.
- Enter the slab thickness, usually 4 inches (10 cm).
- Enter the edge width and the total edge depth from the slab top.
- Read the cubic yards for the ready-mix order.
Thickened Edge Slab Formula
A thickened edge slab equals the slab volume plus (perimeter − 4 × edge width) × edge width × (edge depth − slab thickness). Subtracting 4 edge widths counts each corner of the edge once.
Slab (ft³) = length × width × thickness
Edge (ft³) = (2 × (length + width) − 4 × edge width) × edge width × (edge depth − thickness)
Total (ft³) = slab + edge; cubic yards = total ÷ 27
- Length and width: the outside slab size, in feet (ft).
- Thickness, edge width, edge depth: in inches (in) ÷ 12; edge depth is measured from the slab top.
The metric formula uses meters for every dimension and gives cubic meters (m³).
Total (m³) = L × W × t + (2 × (L + W) − 4 × edge width) × edge width × (edge depth − t)
Worked Example: 24 × 24 ft Slab with a 12 × 12 Inch Edge
A 24 × 24 ft monolithic slab, 4 inches (10 cm) thick with a 12 inch wide edge 12 inches (30 cm) deep, needs 253.3 cubic feet, or 9.38 cubic yards (7.17 m³).
- Find the slab: 24 × 24 × (4 ÷ 12) = 192.0 ft³.
- Find the edge length: 2 × (24 + 24) = 96 ft of perimeter, minus 4 × 1 ft so each corner counts once = 92 ft.
- Find the extra edge depth: 12 in − 4 in = 8 in, or 0.667 ft.
- Find the edge: 92 × 1 × 0.667 = 61.3 ft³. Total: 253.3 ft³ ÷ 27 = 9.38 yd³.
- Add 10% for waste: 10.32 yd³ (7.89 m³).
The shortcut perimeter × edge width × extra depth counts the 4 corner blocks of the edge twice. Here that would add 2.7 ft³ that the slab does not hold, so the calculator subtracts them.
Try it
Drag the sliders and the diagram redraws to scale.
Linked to the calculator above: moving a slider updates your estimate.
With your values
24 ft × 24 ft × 0.333 ft + (2 × (24 ft + 24 ft) − 4 × 1 ft) × 1 ft × (1 ft − 0.333 ft) = 253.33 ft³
- Cubic feet
- 253.33
- Cubic yards
- 9.38
- Cubic meters
- 7.17
Where to Use the Monolithic Slab Calculator
The edge sizes in these 4 one-pour jobs are sample inputs, not code requirements:
- Shed slabs: 12 × 16 ft with a 12 × 12 in edge need 3.65 yd³ (2.79 m³).
- Garage slabs: 24 × 24 ft with a 12 × 12 in edge need 9.38 yd³ (7.17 m³).
- Room additions: 16 × 20 ft with a 12 × 12 in edge need 5.63 yd³ (4.30 m³).
- Workshops: 30 × 40 ft with a 12 in wide, 18 in deep edge need 20.69 yd³ (15.82 m³).
Slab with Footing, Haunch, or Grade Beam
The deeper perimeter band goes by 4 names: thickened edge, haunch, turned-down footing, or footer. A grade beam poured with the slab has the same rectangular section, so the edge fields measure it too.
Enter the average width for an edge with a sloped inner face. Add interior strips under bearing walls with the footing calculator.
Local code, soil, and the engineer decide the edge size and the reinforcement. The calculator measures concrete and gives no structural advice.
Concrete for Common Monolithic Slab Sizes
A 12 × 12 in edge adds 2.27 cubic yards to a 24 × 24 ft slab.
| Slab size | Slab only (yd³) | Edge (yd³) | Total (yd³) | Total (m³) | 80 lb bags |
|---|---|---|---|---|---|
| 12 × 16 ft | 2.37 | 1.28 | 3.65 | 2.79 | 165 |
| 16 × 20 ft | 3.95 | 1.68 | 5.63 | 4.30 | 254 |
| 20 × 20 ft | 4.94 | 1.88 | 6.81 | 5.21 | 307 |
| 24 × 24 ft | 7.11 | 2.27 | 9.38 | 7.17 | 423 |
| 24 × 30 ft | 8.89 | 2.57 | 11.46 | 8.76 | 516 |
| 30 × 40 ft | 14.81 | 3.36 | 18.17 | 13.89 | 818 |
Common Thickened Edge Mistakes
The 3 most common thickened edge mistakes involve the edge depth, the trench width, and the slab thickness.
- Enter the total edge depth from the top of the slab, not only the part below the slab.
- Measure the dug trench. On a 24 × 24 ft slab, a 16 in wide edge in place of 12 in raises the total to 10.10 yd³.
- Keep the edge deeper than the slab. The calculator shows no result when the edge depth is equal to or less than the slab thickness.
Monolithic Slab Concrete Calculator FAQ
How much concrete do I need for a 24 × 24 monolithic slab?
A 24 × 24 ft monolithic slab, 4 inches thick with a 12 × 12 inch edge, needs 9.38 cubic yards (7.17 m³) before waste. The flat slab holds 7.11 yd³ and the edge adds 2.27 yd³. With 10 percent for waste, order 10.32 yd³ of ready-mix concrete.
What is a thickened edge slab?
A thickened edge slab is a flat slab with a deeper band of concrete around its perimeter, poured at the same time. The band works as the footing, so builders call it a monolithic slab, a haunch, or a slab with footer. Local code sets the band width and depth for your soil.
Does the calculator count the corners twice?
No, the calculator counts each corner of the edge once. It subtracts 4 edge widths from the perimeter before it multiplies. The common shortcut, perimeter × edge width × extra depth, counts the 4 corner blocks twice: 2.7 extra cubic feet on a 24 × 24 ft slab with a 12 × 12 inch edge.
How do I calculate concrete for a slab with footings?
To calculate concrete for a slab with footings, add the flat slab volume to (perimeter − 4 × edge width) × edge width × the depth below the slab. Enter the 5 measurements above to get the total. Get the footing width and depth from local code or a structural engineer before you calculate.