Concrete Footing Calculator
This concrete calculator for footings finds the volume of a strip footing (run length × width × depth) or a set of square pad footings. Enter feet, inches, meters, or centimeters. The results show cubic yards, cubic feet, and cubic meters, bag counts, weight, truck loads, and cost, with 10% waste.
By Muhammad AsimPublished Updated How we calculate
Your estimate
Total volume with waste
1.45yd³
- Cubic meters
- 1.11 m³
- Cubic feet
- 39.1 ft³
Premixed bags
- 80 lb bags66
- 60 lb bags87
- 40 lb bags131
- 25 kg bags96
- 20 kg bags119
- Weight
- 5,860 lb · 2,658 kg
- Ready-mix truck loads (10 yd³ each)
- 0.14
- Concrete cost
Formula with your numbers
40 ft × 1.333 ft × 0.667 ft × 1.1 = 39.11 ft³
Includes a 10% waste allowance. Bags are rounded up. Weight uses 2,400 kg/m³ (150 lb/ft³).
Your estimate1.45 yd³ · 66 × 80 lb
Planning several pours or a cost sheet? Get the free Excel template (7 tabs, no sign-up).
How to Use the Footing Calculator
To use the footing calculator, follow these 4 steps.
- Pick Strip footing for a trench or Pad footing for separate pads.
- Enter the length, width, and depth, with a unit next to each field.
- Set the number of footings. Enter 1 for one total strip run.
- Keep the 10% waste allowance or change it, then read the results panel.
Concrete Footing Formula
The concrete footing formula multiplies length × width × depth in feet. For a strip footing, the length is the total run of every trench added together. Divide cubic feet by 27 to get cubic yards.
Volume (ft³) = length (ft) × width (ft) × depth (ft) × number of footings
Cubic yards (yd³) = volume (ft³) ÷ 27
- Length: the total strip run or pad length, in feet (ft).
- Width: the trench or pad width in inches (in) ÷ 12.
- Depth: the concrete depth in inches ÷ 12.
- 27: cubic feet in 1 cubic yard.
The metric footing formula uses meters for every dimension and gives cubic meters (m³).
Volume (m³) = length (m) × width (m) × depth (m)
1 m³ = 1.308 yd³ = 35.3 ft³
Worked Example: 40 ft Strip Footing, 16 × 8 Inches
A strip footing with a 40 ft (12.2 m) total run, 16 inches (41 cm) wide and 8 inches (20 cm) deep, holds 35.56 cubic feet, or 1.32 cubic yards (1.01 m³). The 5 steps below show the math.
- Convert the width to feet: 16 in ÷ 12 = 1.333 ft.
- Convert the depth to feet: 8 in ÷ 12 = 0.667 ft.
- Multiply the dimensions: 40 ft × 1.333 ft × 0.667 ft = 35.56 ft³.
- Convert to cubic yards: 35.56 ÷ 27 = 1.32 yd³.
- Add 10% for waste: 1.45 yd³ (39.11 ft³), or 66 bags of 80 lb concrete.
Site-mixed footings commonly use a 1:2:4 cement : sand : gravel mix.
Try it
Drag the sliders and the diagram redraws to scale.
Linked to the calculator above: moving a slider updates your estimate.
With your values
40 ft × 1.333 ft × 0.667 ft = 35.56 ft³
- Cubic feet
- 35.56
- Cubic yards
- 1.32
- Cubic meters
- 1.01
Where to Use the Footing Calculator
The footing calculator covers 5 common jobs, including deck pads, shed footings, and wall footings. The sizes below are sample inputs, not code requirements:
- Deck footings: 6 pads at 24 × 24 in (61 × 61 cm), 12 in deep, need 0.89 yd³ (0.68 m³).
- Shed footings: 9 pads at 18 × 18 in, 10 in deep, need 16.88 ft³ (0.48 m³).
- Strip foundations: a 48 ft run, 12 × 8 in, under a shed or garden room needs 1.19 yd³ (0.91 m³).
- Wall footings: a 60 ft run, 20 × 10 in, under a block or concrete wall needs 3.09 yd³ (2.36 m³).
- Round footings: use the sonotube calculator for tube forms and round piers.
Concrete Footing Cost
The concrete for the 40 ft strip footing in the worked example costs about $188 to $253 at ready-mix prices of $130–$175 per cubic yard. That covers 1.45 yd³ with 10% waste and nothing else.
An order that small sits under the usual 5 yd³ minimum, so expect a delivery fee of $75–$150 plus a short-load fee of $40–$80. Compare that total with the 66 bags of 80 lb concrete the same footing would take.
Excavation, forms, rebar, and inspection vary with the soil, site access, and local code, so get written quotes for them. The ready-mix prices are for 3,000 psi concrete; ask the supplier to price the mix your plan calls for. To budget a slab poured over the footings, use the concrete slab cost calculator.
Concrete per 10 Feet of Strip Footing
To calculate concrete needed for footings by the foot, find the width and depth below and multiply by your run ÷ 10.
| Width × depth | Cubic feet | Cubic yards | Cubic meters | 80 lb bags |
|---|---|---|---|---|
| 12 × 8 in (30 × 20 cm) | 6.67 | 0.25 | 0.19 | 12 |
| 12 × 12 in (30 × 30 cm) | 10.00 | 0.37 | 0.28 | 17 |
| 16 × 8 in (41 × 20 cm) | 8.89 | 0.33 | 0.25 | 15 |
| 16 × 12 in (41 × 30 cm) | 13.33 | 0.49 | 0.38 | 23 |
| 20 × 8 in (51 × 20 cm) | 11.11 | 0.41 | 0.31 | 19 |
| 20 × 12 in (51 × 30 cm) | 16.67 | 0.62 | 0.47 | 28 |
| 24 × 8 in (61 × 20 cm) | 13.33 | 0.49 | 0.38 | 23 |
| 24 × 12 in (61 × 30 cm) | 20.00 | 0.74 | 0.57 | 34 |
Frost Depth and Footing Depth
The calculator takes the depth you enter; the building code decides how deep that has to be. Under the 2021 International Residential Code, exterior footings sit at least 12 in below undisturbed ground, and below the frost line where frost protection applies. The frost line itself is a local number: each jurisdiction fills it into Table R301.2, so ask the building department.
| Rule | Applies to | What it requires |
|---|---|---|
| R403.1.4 | Exterior footings | At least 12 in (305 mm) below undisturbed ground |
| R403.1.4.1 | Foundation walls, piers, and permanent supports | Below the local frost line, or a frost-protected shallow foundation (R403.3), ASCE 32, or solid rock |
| R403.1.4.1 exceptions | Free-standing accessory buildings, eaves 10 ft or lower | No frost protection up to 600 sq ft (light frame) or 400 sq ft (other construction) |
| R507.3.2 and R507.3.3 | Deck footings | At least 12 in deep; below the frost line when the deck is attached to a frost-protected building |
Depth drives the order on piers and column footings. A 12 in round footing holds 0.79 ft³ at 12 in deep and 2.75 ft³ at 42 in, so check the frost line before you buy. For deck posts, see the pier calculator and the sonotube calculator.
Common Footing Calculation Mistakes
The 4 most common footing mistakes involve trench width, depth units, pad counts, and footing size.
- Measure the dug trench, not the plan. A 40 ft trench dug 18 in wide instead of 16 in takes 4.44 ft³ (0.16 yd³) more concrete at 8 in deep.
- Enter the depth in inches, if the field shows inches. A depth of 8 entered as feet gives a volume 12 times too large.
- Calculate pads of different sizes separately.
- Take footing width and depth from local codes, the soil conditions, or a structural engineer. The calculator measures concrete and gives no structural advice.
Concrete Footing Calculator FAQ
How much concrete do I need for a footing?
A 40 ft strip footing, 16 inches wide and 8 inches deep, needs 35.56 cubic feet, or 1.32 cubic yards (1.01 m³). With a 10 percent waste allowance, plan for 1.45 yd³. Enter your own run length, width, and depth above for an exact figure.
How do I calculate concrete for footers?
To calculate concrete for footers, multiply the total run length × width × depth in feet, then divide by 27 for cubic yards. Footers and footings are the same element. Convert inches to feet by dividing by 12 first, and add 5 to 10 percent for waste and trench irregularities.
Does the footing calculator tell me how big my footing should be?
No, the footing calculator measures concrete volume only and does not size footings. Footing width and depth depend on local codes, the load, and the soil. Get the required size from your building department or a structural engineer, then enter that size above to count cubic yards and bags.
How many bags of concrete do I need for a 24 × 24 inch pad footing?
A 24 × 24 inch pad footing 12 inches deep needs 7 bags of 80 lb concrete or 9 bags of 60 lb concrete, before waste. The pad holds 4.00 cubic feet (0.11 m³). With 10 percent added for waste, plan for 8 bags of 80 lb concrete.
How deep does a concrete footing have to be?
Under the 2021 IRC, an exterior footing goes at least 12 inches below undisturbed ground, and below the local frost line where frost protection is required. The frost depth is set by your jurisdiction in Table R301.2. Small free-standing sheds and some decks are exempt, so check with the building department.
Sources
Footing volume uses plain geometry. The depth rules come from the 2021 IRC as adopted in the copy below; local amendments vary.
- International Residential Code 2021, R403.1.4, R403.1.4.1 and Table R301.2 (Seattle Residential Code 2021, Chapter 4)
- International Residential Code 2021, R506 and R507.3 (Seattle Residential Code 2021, Chapter 5)
- NIST – Unit conversion: SI to U.S. customary units
- How we calculate – formulas, constants, and sources