Skip to content
Concrete Calculator logo

    Type a job, shape or unit, for example "slab", "80 lb bags" or "cubic yards".

    Concrete Beam, Lintel & Pile Calculator

    This concrete quantity calculation for beam, lintel, and pile pours uses length × width × depth for a rectangular beam and π × (diameter ÷ 2)² × depth for a round pile. Enter feet, inches, meters, or millimeters. The results show cubic yards, cubic feet, and cubic meters, bags, and weight, with 10% waste.

    Published Updated How we calculate

    Beam and pile concrete calculator

    Calculate by
    Live diagram
    20 ft12 in18 in

    Your estimate

    Total volume with waste

    1.22yd³

    Cubic meters
    0.93 m³
    Cubic feet
    33.0 ft³

    Premixed bags

    • 80 lb bags55
    • 60 lb bags74
    • 40 lb bags110
    • 25 kg bags81
    • 20 kg bags100
    Weight
    4,944 lb · 2,243 kg
    Ready-mix truck loads (10 yd³ each)
    0.12

    Formula with your numbers

    20 ft × 1 ft × 1.5 ft × 1.1 = 33.00 ft³

    Includes a 10% waste allowance. Bags are rounded up. Weight uses 2,400 kg/m³ (150 lb/ft³).

    Planning several pours or a cost sheet? Get the free Excel template (7 tabs, no sign-up).

    How to Use the Concrete Beam Calculator

    To use the beam calculator, follow these 4 steps.

    1. Pick Beam or lintel or Round pile.
    2. Enter the sizes from the drawings, with a unit next to each field.
    3. Set the number of beams or piles.
    4. Set the waste allowance and read the results.

    Concrete Quantity Calculation for Beam and Pile

    A rectangular beam or lintel uses length × width × depth, and a round pile uses π × (diameter ÷ 2)² × depth. Divide cubic feet by 27 for cubic yards.

    Beam volume (ft³) = length (ft) × width (ft) × depth (ft)

    Pile volume (ft³) = π × (diameter (ft) ÷ 2)² × depth (ft)

    Cubic yards (yd³) = volume (ft³) ÷ 27

    • Length: the beam or lintel span plus bearing at each end, in feet (ft).
    • Width and depth: the beam section, in inches (in) ÷ 12.
    • Diameter: the pile width across, in inches ÷ 12.
    • Pile depth: the full pile length below the cap, in feet.

    In metric, use meters to get cubic meters (m³).

    Beam (m³) = length (m) × width (m) × depth (m)

    Pile (m³) = π × (diameter (m) ÷ 2)² × depth (m)

    Worked Example: 20 ft Beam and 10 ft Pile

    A beam 20 ft (6.1 m) long, 12 inches (30 cm) wide, and 18 inches (46 cm) deep holds 30.00 cubic feet, or 1.11 cubic yards (0.85 m³). A round pile 12 inches across and 10 ft (3.05 m) deep holds 7.85 cubic feet (0.22 m³).

    1. Beam: 20 ft × 1 ft × 1.5 ft = 30.00 ft³, and 30.00 ÷ 27 = 1.11 yd³.
    2. Beam with 10% waste: 1.22 yd³, or 55 bags of 80 lb concrete.
    3. Pile: π × (1 ft ÷ 2)² × 10 ft = 7.85 ft³, or 0.29 yd³.
    4. Pile with 10% waste: 8.64 ft³, or 15 bags of 80 lb concrete.
    20 ft12 in18 in

    Try it

    Drag the sliders and the diagram redraws to scale.

    Linked to the calculator above: moving a slider updates your estimate.

    20 ft
    12 in
    18 in

    With your values

    20 ft × 1 ft × 1.5 ft = 30.00 ft³

    Cubic feet
    30.00
    Cubic yards
    1.11
    Cubic meters
    0.85

    Where to Use the Beam Calculator

    The beam calculator covers 4 common members, including lintels and piles. The sizes are sample inputs, not design sizes:

    • Door and window lintels: a 5 ft lintel, 8 × 8 in, needs 2.22 ft³, or 4 bags of 80 lb concrete.
    • UK lintels: a 1.2 m lintel, 100 × 150 mm, needs 0.018 m³ (0.64 ft³), or 2 bags of 25 kg concrete.
    • Grade beams: a 40 ft beam, 12 × 16 in, needs 1.98 yd³ (1.51 m³).
    • Bored piles: 8 piles at 12 in × 10 ft need 2.33 yd³ (1.78 m³).

    Concrete Lintel Calculator UK and Metric Piles

    For a concrete lintel calculator in UK units, enter millimeters and meters. A lintel 1.2 m long, 100 mm wide, and 150 mm deep holds 0.018 m³ (0.64 ft³). For the concrete calculation of pile volume in metric, a 300 mm pile 3 m deep holds 0.212 m³ (7.49 ft³), or 19 bags of 25 kg concrete before waste.

    Beam, lintel, and pile sizes, reinforcement, and concrete strength come from a structural engineer or the approved drawings. The calculator counts concrete only and gives no structural advice.

    Ring Beams and Bond Beams Around a Building

    A ring beam (or bond beam) runs around the top of the walls, so its length is the building perimeter. Measure to the outside of the walls, then take off 4 beam widths so each corner is counted once:

    Beam length = 2 × (length + width) − 4 × beam width

    Volume = beam length × beam width × beam depth

    For a 30 × 24 ft building with an 8 in wide, 12 in deep beam: 2 × (30 + 24) − 4 × 0.667 = 105.33 ft of beam, holding 70.2 ft³. With 10% waste that is 2.86 yd³ (2.19 m³), or 129 bags of 80 lb concrete.

    Ring beams 8 in (20 cm) wide and 12 in (30 cm) deep, by outside building size
    BuildingBeam lengthCubic feetCubic yardsWith 10% waste (yd³)
    20 × 16 ft69.33 ft46.21.711.88
    24 × 20 ft85.33 ft56.92.112.32
    30 × 24 ft105.33 ft70.22.602.86
    40 × 30 ft137.33 ft91.63.393.73
    50 × 40 ft177.33 ft118.24.384.82
    The beam size and its steel come from the drawings or an engineer.

    Concrete per Foot of Beam by Section

    To estimate a beam by the foot, find the width × depth below and multiply by the beam length in feet.

    Concrete per 1 ft (0.30 m) of rectangular beam, before waste
    Width × depthCubic feetCubic yardsCubic meters
    8 × 8 in (20 × 20 cm)0.440.0160.013
    8 × 12 in (20 × 30 cm)0.670.0250.019
    12 × 12 in (30 × 30 cm)1.000.0370.028
    12 × 18 in (30 × 46 cm)1.500.0560.042
    12 × 24 in (30 × 61 cm)2.000.0740.057
    16 × 24 in (41 × 61 cm)2.670.0990.076
    Multiply each row by the beam length in feet, then add 10% for waste.

    Common Beam and Pile Calculation Mistakes

    The 4 most common beam and pile mistakes are listed below.

    • Add the bearing length at each end of a lintel to the clear opening width.
    • Enter the pile diameter, not the radius. A 12 in pile entered as 6 in gives 1.96 ft³ instead of 7.85 ft³ over 10 ft.
    • Calculate beams and piles of different sizes separately, then add the totals.
    • Take sizes and reinforcement from a structural engineer. The calculator gives volume only.

    Concrete Beam, Lintel & Pile Calculator FAQ

    How much concrete is in a 20 ft beam?

    A 20 ft beam, 12 inches wide and 18 inches deep, holds 30.00 cubic feet, or 1.11 cubic yards (0.85 m³). With a 10 percent waste allowance, plan for 1.22 yd³. Enter your own length, width, and depth above for the exact volume of your beam.

    How do I calculate the concrete for a pile?

    To calculate the concrete for a pile, multiply π × (diameter ÷ 2)² × depth, with both measurements in feet. A 12 inch pile 10 ft deep holds 7.85 cubic feet (0.22 m³). Multiply by the number of piles, then add 5 to 10 percent for waste.

    How much concrete does a UK lintel need?

    A lintel 1.2 m long, 100 mm wide, and 150 mm deep needs 0.018 cubic meters (0.64 ft³), or 2 bags of 25 kg concrete before waste. Use the Beam or lintel mode above with meters and millimeters, and add the bearing at each end to the length.

    Does the beam calculator size the beam or the reinforcement?

    No, the beam calculator measures concrete volume only. Beam depth, width, reinforcement, and concrete strength depend on the span, the load, and local codes. Get those from a structural engineer or the approved drawings, then enter the sizes above to count cubic yards and bags.

    How do I calculate concrete for a ring beam around a building?

    Add the outside length and width, double it, then subtract 4 beam widths so the corners count once. A 30 × 24 ft building with an 8 × 12 inch beam has 105.33 ft of beam, holding 2.60 cubic yards before waste and 2.86 yd³ with 10 percent.

    Sources

    Every result on this page uses plain geometry and the exact unit definitions below. The full list of formulas and constants is on the How we calculate page.

    1. NIST – Unit conversion: SI to U.S. customary units
    2. How we calculate – formulas, constants, and sources